Fermentation timing

100% Rye Pan Loaf — Timing by Kitchen Temperature

Baseline: 2.5h bulk + 1.5h proof at 76°F. Adjust for your kitchen below.

The full 100% Rye Pan Loaf schedule (76°F baseline)

100% Rye Pan Loaf is a hearth-style sourdough from Germany/Denmark. From a ripe levain to a cooled loaf it runs about 6.1 h of dough-day time on top of a ~5-hour levain build. Every duration below is the 76°F baseline — scale it with the temperature table lower down for your own kitchen.

Stage-by-stage 100% Rye Pan Loaf schedule at 76°F
StageDurationElapsed from mix
Levain build to peak (before mixing)~5 h5 h
Autolyse (flour + water rest)builds extensibility before the levain goes in30 min30 min
Mix — add levain & salt18 min48 min
Bulk fermentation with stretch-and-folds3–4 sets of folds in the first ~2 hours, then leave it to rise2.5 h3.3 h
Pre-shape & bench rest24 min3.7 h
Final shape12 min3.8 h
Final proof (room temperature)1.5 h5.3 h
Bake — 425°F in a loaf pan tallabout 50 minutes48 min6.1 h

A sample same-day clock plan

One realistic way to fit 100% Rye Pan Loaf around a normal day, at ~76°F. Shift the whole thing earlier or later to suit — only the gaps between stages matter.

  • 7:00 AM — feed the levain (peaks in ~5 h).
  • 12:00 PMAutolyse.
  • 12:30 PMMix.
  • 12:45 PMBulk fermentation with stretch-and-folds.
  • 3:15 PMPre-shape & bench rest.
  • 3:39 PMFinal shape.
  • 3:48 PMFinal proof.
  • 5:18 PMBake.
  • 6:08 PM — loaf out of the oven; cool at least 1 hour before slicing.

Reading each stage by feel

The clock is a guide; the dough is the real timer. Levain is ready at its peak — domed and just starting to recede, floating in water. Bulk is done at a 50–75% rise with a bubbly, jiggly, domed mass — under-shooting gives a tight crumb, over-shooting a slack, gummy one. Proof is judged by the poke test: a slow, partial spring-back. Watch a warm kitchen closely here — the 1.5 h room proof shortens fast above 78°F.

Temperature × time table

Kitchen tempMultiplierBulk (h)Proof (h)
62°F2.20×5.53.3
68°F1.58×3.92.4
72°F1.23×3.11.8
76°F1.00×2.51.5
80°F0.78×2.01.2
85°F0.56×1.40.8

Calculator pre-set to 100% Rye Pan Loaf

Multiplier at 76°F
Adjusted bulk ferment
2.5 h
Adjusted final proof
1.5 h
How the math works

Multipliers are piecewise-linear interpolations between reference points measured by Myhrvold et al. in Modernist Bread vol 3. 76°F is the baseline (1.0×); every 10°F drop roughly doubles fermentation time, and every 10°F rise roughly halves it.

100% Rye Pan Loaf timing — FAQ

How long does 100% Rye Pan Loaf take start to finish?

Plan on a ~5-hour levain build first, then about 6.1 h of dough-day work at a 76°F baseline. Warmer kitchens run faster and cooler ones slower; use the temperature table below to re-time every stage.

How long is the 100% Rye Pan Loaf bulk ferment?

2.5 h at 76°F. It's done when the dough has risen 50–75%, domed, and jiggles when you shake the container — not strictly at the 2.5 h mark. Multiply by your kitchen's temperature factor (table below) to re-time it.

Can I cold-retard 100% Rye Pan Loaf overnight?

Yes — after shaping, refrigerate the loaf 10–16 hours instead of the 1.5 h room proof, then bake cold straight from the fridge. Cold retard deepens flavour and makes scoring cleaner, and it lets you split the bake across two days.

When is 100% Rye Pan Loaf fully proofed and ready to bake?

Use the poke test: flour a finger, press ~1 cm into the shaped loaf. Ready dough springs back slowly and only partway, leaving a slight dent. Instant spring-back = under-proofed (give it more time); no spring-back and a dense feel = over-proofed (bake immediately, next time shorten the proof).

Sources: Myhrvold et al., Modernist Bread vol 3 (temperature multipliers); Hamelman — Bread 3rd ed., 100% Rye formula.